Project Kale – Healthy Collaboration. Shell 600 Programme

With a vastly expanded programme of 600 projects to deliver for Shell in 2019, Artelia’s multi-site leadership team decided to completely rethink its programme approach. Over 15 new team members would need to be brought in, trained and deployed across six key programme areas: Future Fuels, Jamie Oliver deli by Shell, Waitrose Alliance, rebranding, tank … Continue reading “Project Kale – Healthy Collaboration. Shell 600 Programme”

Integration & Collaboration: The Catalyst

The Catalyst is a ground-breaking, architecturally striking, facility, home to the UK’s National Innovation Centre for Ageing and the National Innovation Centre for Data and is a great example of innovative design developed using BIM level 2. The project, with an extensive set of client requirements, required a collaborative approach between the design and construction team as well as the clients’ stakeholders. … Continue reading “Integration & Collaboration: The Catalyst”

Sister Dora Skills & Simulation Suite

VIDEO: SISTER DORA SKILLS SUITE The £4.8m Sister Dora Skills and Simulation Suite is a state-of-the-art medical teaching facility for students at the University of Wolverhampton incorporating innovative teaching rooms, multi-disciplinary laboratory spaces including mock hospital ward rooms, a bedsit, terraced house, bathing pool and ambulance. The project encompassed a refurbishment of the existing Sister … Continue reading “Sister Dora Skills & Simulation Suite”

Integration & Collaboration: Shire Hall

The re-emergence of Gloucestershire County Council’s Shire Hall after its retrofit and refurbishment reads like a fairy-tale. Over 165 weeks and 82 phases of collaborative, innovative team-working, the part-listed, part 1960’s building, an eyesore, tired and inefficient, was responsibly and dynamically transformed into an elegant and highly sustainable workplace. Shire Hall benefited from innovative strategies … Continue reading “Integration & Collaboration: Shire Hall”

New build prison at Wellingborough

The new build resettlement prison in Wellingborough is an exemplar for integration and collaborative working. Situated on a 36-acre site in Northampton, this vast £253m project will deliver 1,680 prison places through a Partnering Contract. Each partner has worked single-mindedly from day one to create a high-performing, collaborative team with shared objectives and values. The … Continue reading “New build prison at Wellingborough”

M4 Celtic Manor Overbridge

With the construction of the new International Conference Centre Wales (ICCW) at the Celtic Manor Resort (CMR) and a possible 3,000 vehicles leaving at any one time, the existing M4 overbridge structure linking the A48 in Newport to the CMR was considered inadequate to cope with the increase in traffic volumes. In partnership with the … Continue reading “M4 Celtic Manor Overbridge”

Alliance Partnership to deliver ‘state of the art’ facilities for pharmaceutical warehousing, packing and logistics – AstraZeneca and BES

BES are design and construction specialists of regulatory environments for the pharmaceutical, healthcare and life science sectors. Together with our long-standing client, a global biopharmaceutical company, AstraZeneca, we delivered the £50 million project to upgrade and future-fit the warehousing, packing and logistics facilities – which form the central hub for AstraZeneca’s European distribution network. Having … Continue reading “Alliance Partnership to deliver ‘state of the art’ facilities for pharmaceutical warehousing, packing and logistics – AstraZeneca and BES”