“We are now at a point we have never been at before. The industry is standing on a burning platform and all other options have gone. It simply has to change”.
Mark Farmer, UK Construction Week 11th Oct 2017.
The Burning Platform
Over the last few years the construction industry has seen numerous reports, from Latham in 1994, through Egan in 1998, to the most recent one: The Farmer Report entitled “Modernise or Die” published last year. Although these reports drove some initiatives, the industry has failed to change at a scale necessary to make the slightest improvement to levels of productivity in 25 years. The ever-increasing skills gap, low margins and lack of innovation have been at the root cause of large losses for main contractors over the last few years.
So, is Mark Farmer is right? Is the industry now faced with an overwhelming set of factors that, in his words, place it on a burning platform where change is the only option to avoid the flames? And if he is right? What do we do to change? Well, Farmer believes that one of the keys to driving the right kind of change, is “manufacturer-led construction”.
LEGO
As I watched Farmer’s presentation at UK construction week, I recalled a quote I had seen a few years ago:
“We are on a burning platform. We’re running out of cash… [and] likely won’t survive”
This was a quote from the newly appointed CEO of LEGO, Jørgen Vig Knudstorp in 2003, brought in to turn the company around following nearly a decade of declining sales, losses and failed new business models. For years, LEGO had been increasing their number of parts, developing more sets and diversifying. By 2003 they were making electronic toys, clothes and TV shows, they had even opened theme parks. They were haemorrhaging cash and needed to change.
When Knudstorp came in and they analysed this period of expensive and largely unsuccessful disruptive innovation, they discovered one consistent success; a construction toy called Bionicle. This was a typical LEGO construction toy that had numerous accessories that kids used to build different action heroes. The difference with Bionicle is that they had supported this toy with a string of ancillary innovations such as videos, merchandise, books and a video game.
They discovered that their core customers didn’t want other toys, they wanted LEGO to produce bricks. They wanted to construct with LEGO. As a result, their parks were sold off and other toy production stopped. They analysed their sets, slashed the number of parts from 13,000 to 6,500 and focussed on producing sets based on themes that they could support with complimentary offerings.
They called their reduced set of parts, their “pallet” and, although they had no IP, they made it available to everyone, developed and released “Digital Designer” (a design tool) and encouraged their fan base to design new sets, the best of which would go in to production.
By 2015 they were more profitable than Apple.
So, what can we learn from this?
Well, by generating a standardised kit of parts and making it available to anyone, LEGO turned their fans in to designers, able to generate limitless constructions each one completely unique.
Is this not manufacturer-led construction?
Taking this lesson, should, then, construction product manufacturers be providing a reduced, more standardised, pallet of products? A set of compatible products that fit together simply, quickly and easily. Do we, as Tata Steel, start working with window & door companies, sky light manufacturers, M&E installers to develop a click and fix system? By making this pallet available to the industry to design whatever they may choose, is this the future? Is this Farmer’s manufacturer-led construction?
Design for Manufacture and Assembly (DfMA) has been around for some time with companies like Bryden Wood leading the charge. This is the modern construction sector’s take on building from a kit of parts. So why hasn’t it taken off? Well, mostly because there simply aren’t enough standard parts out there to design from. Considerable fabrication and pre-assembly needs to be carried out to engineer a modular set of building elements. Although this is quicker on site, it isn’t always cost effective especially if there isn’t the upfront lead time to generate the assemblies. Economies of scale are needed for these systems to work as the parts are not standard products.
But it is clear that times are changing. Modern design tools enable companies to design buildings based on function and output and then work back to the products they would like to use to build it. This is leading to development of completely new products, ones that could form part of a new “pallet”. This also offers the potential for construction products to be sold as the true solution to a circular economy (dismantle and re-use) adding huge value to building owners, developers and the wider environment. Extensions and building amendments are simplified too as the modular nature and standardised connections remove compatibility issues.
What do we need to do?
Well, if Farmer is right and we need manufacturer-led construction to save us from the “burning platform”, how much of a revolution is required?
It is fair to say that LEGO didn’t succeed based on disruptive innovation, they cleverly used new digital tools to maximise the value from their existing, standardised, system. As we don’t have that in the construction industry, some disruptive innovation is needed to generate that standardised system and associated digital tools. Then, perhaps one day, as in LEGOLAND, we too will be saying: “Everything is awesome”.
About the Author
“Alex Small is the BIM & Digital Platforms manager at Tata Steel Europe. This role involves the delivery of BIM information for Tata Steel’s European businesses as well as the development of tools to develop the digital reach and interlock of the business through its data. Although starting with product-specific data, Alex’s goal is to look at ways in which a wide-ranging array of data (including environmental, production & in-use performance data) might be linked to physical products to add value for product traceability, circular economy and digital construction as a whole.
Alex graduated as a Civil/Structural Engineer in 1996 and worked for 7 years as a Structural Engineer and Project Manager for Ove Arup & Partners. During this time Alex worked on several interesting projects including the Bangkok underground railway system (MRTA) and the National Waterfront Museum in Swansea (which won both a RIBA and a Structural Steel design award). Whilst at Arup, Alex worked in San Francisco, Ghana and London.
In 2003 Alex moved in to the steel industry working initially as UK market development manager for Celsa Steel UK before moving in 2008 to Barcelona to take up a role as head of marketing for the Celsa Group. It was during this time at Celsa that Alex developed a keen interest in the ways in which 3D modelling and detailing can be used to drive construction efficiency and added value throughout the supply chain. Alex was instrumental in driving pre-fabrication and pre-assembly across Celsa’s downstream divisions and ensuring that the true value on site could be realised.
Alex is involved in work for the BIM Alliance, BIM4M2 and the CPA and is a keen advocate for structured data, IoT, DfMA and an integrated, digital, built environment.”
best drugs for erectile dysfunction: canadiandrugsgate.com – pills for ed
sildenafil without a doctor’s prescription: canadian pharmacy drugs gate – medication drugs
can you buy cheap clomid: cheap clomid – cost clomid price
buy amoxicillin 500mg uk https://priligymaxpharm.com/# dapoxetine online
amoxicillin 500mg capsule: Amoxicillin for sale – amoxicillin 500 mg for sale
generic amoxil 500 mg: Com Pharm – cost of amoxicillin
buy prednisone without prescription raypharm prednisone otc uk
amoxicillin cost australia https://prednisoneraypharm.com/# buy prednisone no prescription
amoxicillin generic: cheap amoxil – amoxicillin tablet 500mg
cheap clomid without a prescription: clomid purchase online rex pharm – where to get generic clomid
generic amoxicillin online https://clomidrexpharm.com/# how can i get cheap clomid online
cost cheap clomid pills buy clomid order clomid price
prednisone uk over the counter: prednisoneraypharm – prednisone price australia
buy dapoxetine online: max pharm – buy dapoxetine online
buying prednisone mexico: buy prednisone – 6 prednisone
clomid pills where buy generic clomid can you get generic clomid
prednisone pill 20 mg: Prednisone Without Prescription – generic prednisone pills
prescription prednisone cost: prednisone – prednisone 5 mg tablet without a prescription
buying clomid without rx: clomid online – can i buy cheap clomid online
buy prednisone without rx: raypharm – prednisone 5mg coupon
buy amoxicillin: amoxil – amoxicillin cost australia
buy prednisone without a prescription best price: prednisone – prednisone 12 mg
amoxicillin online no prescription: Amoxicillin Com Pharm – amoxicillin 250 mg capsule
generic clomid without insurance: rexpharm – buying cheap clomid without insurance
buy dapoxetine online: priligy maxpharm – cheap priligy
amoxicillin 500mg capsules antibiotic: amoxil – buy amoxicillin 500mg
amoxicillin 30 capsules price: cheap amoxil – amoxicillin 500 mg for sale
https://iverfast.com/# minocycline for acne
mexican border pharmacies shipping to usa https://mexicanpharmgate.com/ buying prescription drugs in mexico
п»їbest mexican online pharmacies http://mexicanpharmgate.com/ mexican border pharmacies shipping to usa
Priligy tablets: cheap priligy – priligy maxpharm
Cost of Plavix on Medicare PlavixClo buy clopidogrel bisulfate
buy cytotec in usa: buy cytotec cytpremium – buy cytotec over the counter
where can i get clomid without prescription: rex pharm – how can i get cheap clomid online