Phil Wilbraham
Phil joined Heathrow in 2003 and became Expansion Programme Director in 2017 accountable for delivering Heathrow’s third runway along with the infrastructure to support it. Previously as Development Director, Phil was accountable for all the Capital works at Heathrow. As Eastern Campus Programme Director, Phil, was accountable for the delivery of the airport’s new Terminal 2. Before this, Phil led the completion of the £4.3bn construction of Terminal 5 and prior to that he led the £350 million Terminal 5 Landside Development Project.
Phil was previously Director of Civil Engineering with TPS Consult, where he was involved in private and public sector schemes from feasibility stage through to design, construction and completion. This included working for BAA on Terminal 5 and many other projects at Heathrow, Gatwick and Stansted, as well as with many other clients. Phil has also worked both overseas and in the UK as a civil engineer for DHV and Mott MacDonald.