Margam Green Energy Plant

Constructing Excellence

Interserve are responsible for the £27.5M civil element of this £105M biomass process plant on a brown-field site in Margam, Port Talbot. This vast jointventure project encompasses a boiler house (45m), a woodchip building (25m), chimney stack (65m) and an administrative building (3.5m).

Interserve is principal contractor for the entire project, which means that we have responsibility for all jointventure partner (JVP) works.

Of the 162 companies that have been involved with the project, 34 have been
foreign, with 17 different languages and cultures present.

There has been an average of 429 operatives on site during the day and 67 operatives at night.

The site has been 24/7 since July 2016.

Interserve has been responsible for all these operatives:

  • over 3000 site inductions have taken place
  • 544 risk assessments and method statements reviewed
  • There have been 0 reportable incidents on site