Sarah Guy
Sarah Guy originally started at BAM as an administrator in February 2013, having already completed a first class degree in August 2008 in Sport and Exercise Science at Nottingham Trent … Continue reading “Sarah Guy”
Sarah Guy originally started at BAM as an administrator in February 2013, having already completed a first class degree in August 2008 in Sport and Exercise Science at Nottingham Trent … Continue reading “Sarah Guy”
On the evening of 17th November 2017 we celebrated the winners of our eleventh Constructing Excellence National Awards. These are our annual showcase for excellence in the built environment sector … Continue reading “Winners of the 2017 Constructing Excellence National Awards revealed”
The project was for the design and construction of a 35,000t per annum Anaerobic Digestion Facility on a Brownfield site in Cardiff. The project consisted of Reception Building, Tank Farm, … Continue reading “Tremorfa Food Waste Anaerobic Digestion Plant”
The project was to deliver new coastal defences to Milton Common, located on the east coast of Portsea Island, Portsmouth. The defences provide a 1:500 year standard of protection to … Continue reading “North Portsea Island CFERM Scheme – Phase 2: Milton Common and Great Salterns Quay”
People across the UK were shocked to see dramatic images of floods surging through Leeds in December 2015 as the River Aire burst its banks, swelled by record-breaking rainfall. Leeds … Continue reading “Leeds Flood Alleviation Scheme”
The A556 Knutsford to Bowdon improvement scheme involves constructing a new 7.5km dual carriageway that connects the M6 J19 in Tabley with the M56 J7 at Bowdon. The existing mixture … Continue reading “Highways England A556 Knutsford to Bowdon Improvement Scheme”
The A372 is a strategically important part of the Somerset highways network, acting as the main route between the areas of Langport, Yeovil and the A303. Drainage capacity through Beer … Continue reading “Beer Wall Flood Alleviation (Phase 3)”
The A45 Southern Bridge replacement project was vital to improve traffic capacity, reduce congestion, and improve general highway safety. The old bridge had weak parapets, substandard waterproofing and drainage, and … Continue reading “A45 South Bridge Replacement Project”
This section of A1 carries in excess of 116,000 vehicles a day, more than double its original capacity. Consequently, heavy congestion occurred daily in both directions for most of the … Continue reading “A1 Coal House to Metro Centre Improvements”
Building Project of the Year Title: Costa – The Roastery Organisation: Artelia Description: Seeking to increase its roasting capacity to support its international growth ambitions, Costa’s has invested £38 million in a state-of-the-art … Continue reading “Constructing Excellence East of England Awards Winners 2017 Revealed”