The Clifton College Sports Hall project exemplifies value-based decision-making, delivering a high-performance, sustainable facility that enhances student experience, supports professional athlete development, and provides wider community benefits. The project replaced an energy-intensive inflatable dome with a state-of-the-art sports hall, designed to maximise quality, sustainability, and long-term impact while remaining on time and on budget.
From the outset, value was clearly defined through collaboration between the client, delivery team, and key subcontractors. The project focused on outcome-based decision-making, ensuring budget was directed towards high-quality equipment and user experience, rather than unnecessary structural elements. This enabled Clifton College to invest in best-in-class sports flooring, multi-use facilities, and top-tier equipment, reinforcing its legacy of producing professional athletes, including Olympians.
Sustainability was a core driver, with the hall designed to BREEAM Excellent standards, incorporating a fabric-first approach, high-performance insulation, and on-site renewable energy. Social value was embedded throughout delivery, with £3.26M (40% of project value) generated through local employment, apprenticeships, supply chain investment, and community initiatives.
Three Winning Facts:
- £600k cost savings vs. competitors, delivered without compromising quality or performance.
- Value-engineered solutions redirected budget to world-class sports facilities, supporting both student athletes and the wider community.
- Long-term impact prioritised, with sustainable design ensuring reduced operational costs and a lasting legacy for professional sports development at Clifton College.